Matmut stadium - Training centre
Training centre - LOU Rugby
Turnkey installation of a complete village for LOU Rugby at Matmut Stadium in Gerland: refreshment stalls, brasserie, shop, training centre, ticket office and reception areas.
2011
Turnkey installation of a complete village for LOU Rugby at Matmut Stadium in Gerland: refreshment stalls, brasserie, shop, training centre, ticket office and reception areas.
Our GL Events teams have installed two reception areas at the Parc des Sports Annecy for the Evian Thonon Gaillarde FC club: a two-storey space with a surface area of 1,400 m² and a second space on a single 500 m² floor.
To allow LOU Rugby to play in the TOP 14, GL Events designed and built a new complete stadium in 82 days, during the off-season. Our teams have installed 50 m² of permanent shops dedicated to the Lou Rugby Club, open year round.
Turnkey installation of a complete village for LOU Rugby at Matmut Stadium in Vénissieux: refreshment stalls, brasserie, shop, ticket office and reception areas. The entire installation covers an area of 3,000 m².
This project included 5 refreshment stalls, for a total area of 250 m².
The Léo Lagrange stadium wanted to increase its capacity when hosting matches of its home club, Chalon Rugby, by building a covered grandstand with 1,800 seats. The project was delivered on a turnkey basis, from the foundations to the fittings, roofing, roads and lighting.